Data center profile · Near Underwood, McLean County, North Dakota (Coal Creek Station site)

Rainbow Energy Park, Coal Creek Station

800-acre data center park zoned beside North Dakota's largest coal plant in McLean County, marketed at up to 300 MW; no tenant, permit or construction.

Zoned, no tenant. McLean County rezoned 800 acres for data-center lots on June 17, 2025; Rainbow says it negotiates a power contract with one unnamed developer. As of Oct. 2026 no tenant, permit or construction on record; planned gas generation is not permitted.
300 MW
data center capacity the approval allows, as reported (press)
not a tenant commitment; company slides show 285 MW and 130 MW expansion tranches
800 acres
rezoned from farmland to commercial, June 17, 2025
for outlots to data centers or other commercial users
1,151 MW
existing coal plant that would supply the park behind the meter
plant, not data-center load; company also plans 2 GW or more of new gas, unpermitted
2.1 GW
power contract under exclusive negotiation (company slide)
not signed; much larger than the 300 MW zoning figure
OperatorRainbow Energy Center, LLC (owner of Coal Creek Station)
CustomerNone named; exclusive power contract talks with an unnamed data center developer
Planned IT capacity240 MW at full build-out (our estimate from the company's 0.3 GW campus power figure)
First building in serviceOur estimate: 2027 (range 2027 to 2029).
Next stepNone dated: Rainbow says construction is anticipated soon, but no start, tenant or contract is on record
Power

Power and the grid

Related generation and energy contracts (context, not added to campus supply)

Getting on the grid

Who supplies what, what it costs, and what is still not public.

  1. Jan. 6, 2022
    Minnesota approves the line transfer
    The Minnesota Public Utilities Commission moves the permit for the 436-mile direct-current line to a Rainbow affiliate, the last approval for the plant sale. State agency · Jan. 2022
  2. May 2, 2022
    Rainbow takes over the plant
    The sale from Great River Energy closes after the cooperative had planned to shut the plant in 2022. Company · May 2022
  3. June 26, 2025
    Bakken gas pipeline announced
    A partner proposes a 36-inch, 136-mile Phase I line of about 1.1 million Dth a day, with Rainbow as anchor shipper. Company · Jan. 2026
  4. Oct. 29, 2025
    Substation ready, contract unsigned
    Rainbow tells state legislators its substation is ready and that it is negotiating exclusively with one developer. Company · Oct. 2025

On-site generation on file

Generating now: federal monthly fuel and generation records (EIA-923) show the on-site plant producing power.

Permits

Permits checklist

3 granted · 1 checked, nothing on file

Approvals a campus like this normally needs (including an air permit for backup or on-site generators), and what we found.

Risks

What could slow it down

Money

Money on record

$250M+
invested at the energy park since the 2022 purchase (company says)
all park projects, not specific to data centers Company · Jan. 2026
$5M
state road loan the county applied for, Nov. 2025
no obligation to accept; an earlier $10.2M request was authorized in Oct. 2025; no loan agreement found Local government · Nov. 2025
Timeline

What happened, and what is due

SitePaper trailConstructionPowerPermitsMoneyLegalUpcoming
  1. 2020
    Site Great River Energy announces plans to shut Coal Creek Station in 2022 News report · 2020
  2. July 30, 2021
    Money Great River Energy's member cooperatives approve selling the plant and line to Rainbow, with a power contract back to the cooperative State agency · July 2021
  3. May 2, 2022
    Money Rainbow closes its purchase of Coal Creek Station and the direct-current line Company · Feb. 2022
  4. June 17, 2025
    Permits McLean County Commission rezones 800 acres for data-center outlots, 3-0 Local government · June 2025
  5. June 26, 2025
    Power Partner and Rainbow announce a 36-inch Bakken gas pipeline toward the site Company · Jan. 2026
  6. Oct. 21, 2025
    Permits County approves a 50.35-acre zoning change and authorizes a $10.2M road loan application Local government · Oct. 2025
  7. Oct. 29, 2025
    Power Rainbow tells legislators it is exclusively negotiating a power contract with an unnamed data center developer Company · Oct. 2025
  8. Nov. 25, 2025
    Money County backs a federal coal-plant funding bid and approves a $5M road loan application Local government · Nov. 2025
  9. Jan. 6, 2026
    Money Rainbow says it has invested more than $250M at the energy park since 2022 Company · Jan. 2026
  10. Oct. 7, 2026
    Site Market reporting still shows the expansion as planned, with no construction, tenant or building permit News report · Oct. 2026
The buildings

Specs

2 lignite units
Coal Creek Station, the state's largest coal plant, coal from the nearby Falkirk Mine
36-inch pipeline
proposed Bakken gas supply, 136 miles for Phase I
Who is involved

Owners, partners and builders

Owners
  • Rainbow Energy Center, LLC: plant owner and park developer
  • Rainbow Energy Marketing Corp.: parent
  • Nexus Line, LLC: owns the direct-current transmission line
Partners
  • Intensity Infrastructure Partners: proposed gas pipeline
  • Blue Flint Ethanol: neighboring biorefinery on plant steam
  • Adakon Energy Solutions: 225 MW crypto mining customer
  • Great River Energy: seller of the plant, power buyer, line operator
Decision-makers
  • McLean County Commission: rezoning and building permits
  • North Dakota DEQ: air permits
  • Bank of North Dakota: road loan
Still unknown

Open questions

Where this comes from

155 records from 36 documents

Drawn from news reports, company statements, state agency records, public and commercial datasets and local government records, each kept with its date and source. The bar shows documents by type.

News report 11Company 8State agency 8Dataset 6Local government 4
Evidence

Every quote behind this page

Grade key: A = the primary record itself (permit, filing, exhibit) · B = a dated official statement · C = news reporting. Map distances are our own measurements on OpenStreetMap and carry no grade. Allegations in lawsuits are marked as such in the quotes.

Power (44)
  • On-site generation: 1215.6 MW
    “Gen 1 and Gen 2: 2x 604.8 MW Conventional Steam Coal, status OP; Gen 4 and Gen 5: 2x 3.0 MW Petroleum Liquids, status SB; nameplate sum 1,215.6 MW”
  • EIA status: OP (operating)
    “Generators 1 and 2 (604.8 MW each, Conventional Steam Coal) carry status (OP) Operating”
  • EIA status: SB (standby/backup)
    “Generators 4 and 5 (3.0 MW each, Petroleum Liquids) carry status (SB) Standby/Backup: available for service but not normally used”
  • On-site power technology: Conventional Steam Coal (ST)
    “Technology Conventional Steam Coal, prime mover ST, energy source RC: generators 1 and 2 at 604.8 MW each”
  • On-site power technology: Petroleum Liquids (IC)
    “Technology Petroleum Liquids, prime mover IC, energy source DFO: generators 4 and 5 at 3.0 MW each”
  • Net generation reported to EIA: 830820.005 MWh
    “Plant Id 6030; Netgen July 2026: DFO 0 + DFO 49.395 + LIG 0 + RC 830770.61 (Megawatthours)”
  • Net generation reported to EIA: 7983627.995 MWh
    “Plant Id 6030; sum of monthly Netgen, August 2025 through July 2026: 7983627.995 Megawatthours”
  • Fuel burned, reported to EIA: 11285 barrels
    “Plant Id 6030; Reported Fuel Type Code DFO; Physical Unit Label barrels; Quantity summed August 2025 to July 2026: 11285”
  • Fuel burned, reported to EIA: 91 barrels
    “Plant Id 6030; Reported Fuel Type Code DFO; Physical Unit Label barrels; Quantity July 2026: 91”
  • Fuel burned, reported to EIA: 0 short tons
    “Plant Id 6030; Reported Fuel Type Code LIG; Physical Unit Label short tons; Quantity summed August 2025 to July 2026: 0”
  • Fuel burned, reported to EIA: 0 short tons
    “Plant Id 6030; Reported Fuel Type Code LIG; Physical Unit Label short tons; Quantity July 2026: 0”
  • Fuel burned, reported to EIA: 6302678 short tons
    “Plant Id 6030; Reported Fuel Type Code RC; Physical Unit Label short tons; Quantity summed August 2025 to July 2026: 6302678”
  • Fuel burned, reported to EIA: 632634 short tons
    “Plant Id 6030; Reported Fuel Type Code RC; Physical Unit Label short tons; Quantity July 2026: 632634”
  • First month reported to EIA: Jan. 2022
    “Plant Id 6030; Plant Name Coal Creek; Netgen January 2022 reported across Page 1 rows: DFO 0 + DFO 254.661 + LIG 0 + RC 825520.34”
  • County code: 38055
    “FCC census block find: plant polygon centroid 47.380883,-101.144048 returned County FIPS 38055 McLean County (block 380559608004333); Underwood converter substation centre 47.37348,-101.15642 also returned 38055 McLean County (block 380559608004330)”
  • Nearest power line of 345 kV or more: 0.99 km
    Measured on OpenStreetMap map data.
  • Nearest gas pipeline: no gas pipeline within 40 km - nearest pipeline of any kind is 31.63 km away (, substance untagged)
    Measured on OpenStreetMap map data.
  • Nearest substation of 345 kV or more: 1.24 km
    Measured on OpenStreetMap map data.
  • Rainbow and Intensity Infrastructure Partners announced a 36-inch natural gas pipeline project to fuel power growth at the energy park (Jan 6, 2026)
    “Intensity Infrastructure Partners and Rainbow Energy Center to Advance 36-Inch Natural Gas Pipeline Fueling Power Growth in North Dakota”
  • Intensity Infrastructure Partners and Rainbow Energy Center announced a 36-inch Bakken natural gas pipeline (Phase I: 136 miles, Watford City to near Washburn, ~1,100,000 Dth/d; Phase II: 208 miles to Casselton); Rainbow
    “Phase I includes construction of 136 miles of 36-inch natural gas transmission pipeline, with a capacity of approximately 1,100,000 Dth/d, originating near Watford City, ND, and terminating near Washburn, ND”
  • Name: Rainbow Energy Park (Coal Creek Station)
    “Produces reliable and affordable power - The pillar of Rainbow Energy Park”
  • Utility service: not stated
    “Independent Power Producer (IPP) - Not a traditional power utility or co-operative”
  • Utility: Rainbow Energy Center, LLC (own plant; IPP, no ratepayer utility)
    “Independent Power Producer (IPP) - Not a traditional power utility or co-operative”
  • Grid operator: MISO
    “Midcontinent Independent System Operator (MISO) market participants”
  • Substation: Rainbow Substation
    “Rainbow Substation is ready to deliver power”
  • Transmission: Nexus Line: 436-mile HVDC (410 kV) line from Coal Creek Station to near Minneapolis, MN; can deliver up to 1,172 MW into MISO
    “436-mile HVDC (410 kV) transmission line that can deliver up to 1,172 MW of power into the MISO system near Minneapolis, Minnesota”
  • Power plan: onsite - behind-the-meter supply from Coal Creek Station
    “On-site, behind-the-meter, interruptible load allows real-time market adaptation while maintaining system reliability, locating large loads through MISO's processes”
  • Existing on-site load is cryptocurrency mining, not AI/HPC: Adakon Energy Solutions takes 225 MW interruptible behind the meter and Rainbow runs its own 4 MW liquid-immersion mining facility (Rainbow's Oct 2025 legislati
    “Onsite third-party load (225 MW) - Adakon Energy Solutions”
  • Rainbow's legislative deck lists Data Expansion tranches of 285 MW and 130 MW powered by Coal Creek Station and a 2.1 GW Power Purchase Agreement under exclusive negotiation - larger and differently-scoped than the 300 M
    “Data Expansion (285 MW & 130 MW) - Powered by Coal Creek Station”
  • Rainbow plans 2+ GW of new natural-gas generation anchored by Coal Creek to serve data-center load behind the meter (company deck). Not permitted; no MISO queue record found; not booked in any campus MW field.
    “2+ GW new natural-gas generation”
  • On-site generation: 1,151 MW
    “Rainbow Energy Center, LLC plans to operate the 1,151-megawatt (MW) power plant using current plant employees they hire.”
  • transmission construction permit transfer: approved
    “the sale of Coal Creek Station to Rainbow Energy Center LLC cleared its final regulatory hurdle. The Minnesota Public Utilities Commission today unanimously approved the transfer of Coal Creek Station's high-voltage direct current transmission line”
  • generator interconnection agreement amendment: order issued
    “The Federal Energy Regulatory Commission on Dec. 30 issued an order effective on Jan. 1 approving an amended generator interconnection agreement between Great River Energy and the region's grid operator”
  • IT capacity: not stated
    “The approval, which was tendered in June, includes plans to develop data centers with a capacity of up to 300MW on the site.”
  • October 2026 market reporting (LandGate) still classifies the Coal Creek data-center expansion as planned; no construction, tenant or building permit for the park has been announced.
    “Rainbow Energy's planned data center expansion at the 1,151 MW Coal Creek Station in McLean County”
  • On-site generation: 1,151 MW
    “The McLean County Commission recently approved the reclassification of about 800 acres near Rainbow Energy Center's 1,151-MW Coal Creek Station”
  • Stated campus size: 300 MW
    “The approval, which was tendered in June, includes plans to develop data centers with a capacity of up to 300MW on the site.”
  • A wind farm previously planned at the Coal Creek site was put on hold in 2024 due to local opposition (separate from GRE's 400 MW Discovery Wind, which uses HVDC transmission rights under the sale arrangements).
    “Plans for the wind farm were put on hold last year due to local opposition.”
  • Registry status: DC PROJECT: ANNOUNCED ONLY, NO AGENCY ACTION
    “the McLean County Commission approved a request from Rainbow Energy to convert the zoning classification of 800 acres of land near the plant to commercial”
  • Stated campus size: 300 MW
    “The approval, which was tendered in June, includes plans to develop data centers with a capacity of up to 300MW on the site”
  • Interconnection status: direct-from-plant supply, no docket: the rezoned energy-park outlots would draw power directly from Coal Creek Station, whose owner Rainbow Energy Center is an independent power producer with no r
    “No project has been announced for the industrial park as of yet, according to county officials, with discussions ongoing.”
  • Utility service: 300 MW
    “The 800 acres, located west of the plant's coal pile, will be developed into outlots for businesses, primarily data centers and potentially cryptocurrency operations, drawing 200 to 300 megawatts of power directly from Coal Creek Station”
  • Utility: Rainbow Energy Center LLC (independent power producer) - park load is to be drawn directly from Coal Creek Station behind the meter; the plant also exports over the Nexus HVDC line to Minnesota
    “will be developed into outlots for businesses, primarily data centers and potentially cryptocurrency operations, drawing 200 to 300 megawatts of power directly from Coal Creek Station”
  • Host plant context: former owner Great River Energy announced in 2020 its intention to shutter Coal Creek Station in 2022 - the closure plan that produced the 2021-22 sale to Rainbow.
    “the previous owner, Great River, a wholesale electric power cooperative, announcing its intention to shutter the plant back in 2020”
Money and contracts (24)
  • Construction stage: none - no data-center construction through Oct 2026; county advancing road-improvement loans for the site; Rainbow marketing outlots and negotiating a PPA
    “apply for a $5 million loan through the Bank of North Dakota (BND) Infrastructure Revolving Loan Fund for a Rainbow Energy and Blue Flint Ethanol road project”
  • state infrastructure loan application: amount 5000000 USD
    “apply for a $5 million loan through the Bank of North Dakota (BND) Infrastructure Revolving Loan Fund for a Rainbow Energy and Blue Flint Ethanol road project”
  • state infrastructure loan application: condition No obligation to accept the loan
    “approve the $5 million dollar BND loan application with the understanding that there is no obligation to accept the loan”
  • state infrastructure loan application: amount rate term 10200000 USD
    “Erickson stated that the application is for $10.2 million at an interest rate of 2% for a 20-year loan term.”
  • state infrastructure loan application: purpose Build up and pave the road leading to the Rainbow Energy Data Center; repayment via a special assessment district (discussed)
    “The funds will be used to build up and pave the road leading to the Rainbow Energy Data Center.”
  • state infrastructure loan application: status FINDING: application authorized for submission only; no executed loan agreement appears in the county record opened
    “Erickson stated that the application is for $10.2 million at an interest rate of 2% for a 20-year loan term.”
  • DOE awarded UND's EERC $38M (May 2023) for a carbon-capture FEED study at Coal Creek with Rainbow as partner; a planned on-site wind farm was put on hold amid local opposition (plant-level context, not DC capacity)
    “In May 2023, the University of North Dakota's Energy & Environmental Research Center (EERC) received US$38 million from the U.S. Department of Energy for a Carbon Capture and Storage (CCS) project at Coal Creek Station”
  • Stated capital cost: 250000000 USD
    “Since then, Rainbow has driven more than $250 million in investment at its energy park at Coal Creek Station”
  • Rainbow states more than $250 million has been invested at the Coal Creek energy park since the May 2022 acquisition (all park investments, not data-center-specific).
    “Since then, Rainbow has driven more than $250 million in investment at its energy park at Coal Creek Station”
  • Tenants: none announced for the park
    “Exclusively negotiating a PPA with an experienced data center developer”
  • Tenant status: negotiating - Rainbow states it is exclusively negotiating a PPA with an unnamed experienced data center developer
    “Exclusively negotiating a PPA with an experienced data center developer”
  • power purchase agreement (data center): status FINDING: not executed - Rainbow states it is exclusively negotiating a PPA (deck labels it 2.1 GW) with an experienced data center developer; no executed PPA, lease, ESA or
    “Exclusively negotiating a PPA with an experienced data center developer”
  • Plant context: Rainbow applied to the ND Industrial Commission's Clean Sustainable Energy Authority for a $42.5M loan toward an $85M ash-beneficiation project at Coal Creek (EcoMaterial Technologies / Barr Engineering) -
    “The proposed total cost is $85,000,000, with $42,500,000 loan from the North Dakota Industrial Commission (NDIC) and $42,500,000 cash from Rainbow Energy Center, LLC”
  • asset purchase agreement: scope Coal Creek Station power plant plus the 436-mile HVDC transmission system
    “Great River Energy's member cooperatives approved the updated agreement for the sale of Coal Creek Station and the high voltage direct current (HVDC) system to Rainbow Energy Center, LLC and Nexus Line, LLC”
  • asset purchase agreement: closing conditions Subject to regulatory approvals and GRE member approval; closing expected no earlier than May 1, 2022
    “The sale of Coal Creek Station and the HVDC system is expected to close no earlier than May 1.”
  • transmission O&M agreement: term GRE operates and maintains the HVDC system under contract 20 years
    “Great River Energy will continue to operate and maintain the HVDC system under a 20-year contract with Nexus Line.”
  • transmission rights agreement: scope GRE right to interconnect to the HVDC system and transmit 400 MW of wind energy delivered in Minnesota MW
    “an arrangement for Rainbow Energy Center and Nexus Line to provide Great River Energy with the right to interconnect to the HVDC system and transmit on it 400 MW of wind energy”
  • generator interconnection agreement (amended): point of interconnection Point of interconnection moved from Coal Creek Station Substation to Dickinson Substation (Minnesota terminus of the HVDC system); FERC order Dec 30
    “changes Coal Creek Station's point of interconnection on the electric grid from the Coal Creek Station Substation to the Dickinson Substation adjacent to the Minnesota terminus of the HVDC system”
  • power purchase agreement: volume and term 1,050 MW for approximately two years, then 300 MW for approximately eight years MW
    “GRE will buy 1,050 megawatts of power from Rainbow Energy Center for approximately two years, followed by 300 megawatts for approximately eight years”
  • power purchase agreement: termination FINDING: no termination, curtailment or pricing terms of the GRE PPA appear in any public document opened; the only public description is the volume/term summary in the Governor's re
    “GRE will buy 1,050 megawatts of power from Rainbow Energy Center for approximately two years, followed by 300 megawatts for approximately eight years”
  • Pending sale of Coal Creek Station to Rainbow Energy Center LLC and the HVDC system to Nexus Line LLC announced June 30, 2021; GRE member cooperatives approved the sale July 30, 2021 and reaffirmed an updated agreement F
    “Gov. Doug Burgum and Lt. Gov. Brent Sanford applauded today's vote by Great River Energy's member cooperatives to approve the sale of Coal Creek Station near Underwood to Rainbow Energy Center LLC”
  • Plant context: DOE awarded $38M to UND's Energy & Environmental Research Center for a carbon capture and storage FEED study at Coal Creek Station with Rainbow Energy Center (includes UIC Class VI permit work). Not campus
    “the University of North Dakota's Energy & Environmental Research Center (EERC) received US$38 million from the U.S. Department of Energy for a Carbon Capture and Storage (CCS) project at Coal Creek Station”
  • WDEA reported the Coal Creek sale financing included $150M from the Bank of North Dakota (Legacy Fund supported) and North Dakota Transmission Authority bonding.
    “Legacy Fund Supported Coal Creek - Financing Includes $150M from Bank of ND - ND Transmission Authority Bonding Also Used”
  • asset purchase agreement: price FINDING: purchase price and other deal terms were not publicly disclosed in any source opened
    “Terms of the deal have not been publicly disclosed.”
Permits and government (16)
  • air permit to construct (BART): EPA approval effective
    “Coal Creek Station Units 1 and 2. PTC21001 Air Pollution Control Permit to Construct for Best Available Retrofit Technology (BART)”
  • McLean County Commission: Rainbow Energy items: (1) letter of support for Rainbow Energy Center's application to the DOE Restoring Reliability: Coal Recommissioning and Modernization initiative; (2) application for a $5M
    “request the commission's support of Rainbow Energy Center's application for funding through the U.S. Department of Energy (DOE) Restoring Reliability: Coal Recommissioning and Modernization initiative”
  • zoning change: approved
    “approve the request submitted by Rainbow Energy Center requesting a zoning change on land described as Section 18, Township 145 North, Range 82 West (50.35 acres)”
  • right-of-way / boring permit (fiber): approved
    “approve the permit for WRT to install fiber cable telecommunications facilities to provide diversity to Rainbow Energy facilities”
  • McLean County Commission: Rainbow Energy items: (1) zoning change on 50.35 acres (Sec. 18, T145N R82W); (2) Bank of North Dakota Infrastructure Revolving Loan Fund application ($10.2M, 2%, 20 years) for the road to the R
    “The funds will be used to build up and pave the road leading to the Rainbow Energy Data Center.”
  • Rezoning date: June 17, 2025
    “This land will provide a commercial zone to be divided into outlots for data centers or other commercial business that will be constructed after obtaining any required building permits from the county.”
  • Construction stage: none - land rezoned agricultural to commercial on June 17, 2025; no building permits issued; no specific project announced
    “This land will provide a commercial zone to be divided into outlots for data centers or other commercial business that will be constructed after obtaining any required building permits from the county.”
  • Announced: June 17, 2025
    “This land will provide a commercial zone to be divided into outlots for data centers or other commercial business that will be constructed after obtaining any required building permits from the county.”
  • rezoning (zoning change): approved
    “This land will provide a commercial zone to be divided into outlots for data centers or other commercial business that will be constructed after obtaining any required building permits from the county.”
  • McLean County Commission: Rainbow Energy Center, LLC application to rezone 800 acres from agricultural to commercial for data-center outlots (Secs. 13/18, T145N R82-83W), concurring with Planning & Zoning Commission
    “This land will provide a commercial zone to be divided into outlots for data centers or other commercial business that will be constructed after obtaining any required building permits from the county.”
  • Air Pollution Control Permit to Construct (BART): Issued; state effective July 27, 2022; approved into the ND State Implementation Plan by EPA (91 FR 11474, Mar 10, 2026)
    “Air Pollution Control Permit to Construct for Best Available Retrofit Technology (BART)”
  • North Dakota Legislative Interim Energy Development and Transmission Committee: Rainbow Energy Center briefing at Coal Creek Station on the plant, the Nexus Line and the Rainbow Energy Park data-center plans
    “Exclusively negotiating a PPA with an experienced data center developer”
  • Title V air operating permit: Operating permit of record for Coal Creek Station (cited in the permittee's own 2023 CCR Fugitive Dust Control Report, posted Feb 2024)
    “air emissions are regulated by the NDDEQ in accordance with the Air Pollution Control Title V Operating Perming, Permit Number T5-F82006”
  • UIC Class I nonhazardous waste injection permit (modification): Permit modification noticed for public comment December 5, 2022 (Rainbow Energy Center, 2875 Third Street SW, Underwood); base permit held by the plant oper
    “to revise Rainbow Energy Center's (Rainbow) Class I nonhazardous waste underground injection control permit ND-UIC-106”
  • McLean County Commission approved rezoning ~800 acres from agricultural to commercial (Jun/Jul 2025), enabling the data center development
    “The McLean County Commission recently approved the reclassification of about 800 acres near Rainbow Energy Center's 1,151-MW Coal Creek Station”
  • Water supply: McLean-Sheridan rural water line identified for administrative buildings; data-center cooling water supply still under evaluation (county hearing reporting)
    “a McLean-Sheridan water line could support administrative buildings, with further evaluations ongoing for additional needs”
Site and other (14)
  • County code: McLean County, ND (38055)
    “involving land described as the N of Section 13, Township 145 North, Range 83 West and the N of Section 18, and SW of Section 18, Township 145 North, Range 82 West involving 800 acres”
  • McLean County approved a letter of support for Rainbow Energy Center's application to the U.S. DOE Restoring Reliability: Coal Recommissioning and Modernization initiative (plant modernization funding).
    “request the commission's support of Rainbow Energy Center's application for funding through the U.S. Department of Energy (DOE) Restoring Reliability: Coal Recommissioning and Modernization initiative”
  • Developer: Rainbow Energy Center, LLC
    “involving land described as the N of Section 13, Township 145 North, Range 83 West and the N of Section 18, and SW of Section 18, Township 145 North, Range 82 West involving 800 acres”
  • Acres: 800 acres
    “involving land described as the N of Section 13, Township 145 North, Range 83 West and the N of Section 18, and SW of Section 18, Township 145 North, Range 82 West involving 800 acres”
  • Original target date: not stated
    “Construction - Anticipated soon”
  • Current target date: not stated
    “Construction - Anticipated soon”
  • Land owner: Rainbow Energy Center, LLC
    “800 acres of Rainbow owned land has been commercially zoned and marketed as available”
  • City: Underwood
    “Formed by long-time business partners, Rainbow acquired Coal Creek Station near Underwood, ND in May 2022”
  • Announced: June 30, 2021
    “The pending sale to Rainbow Energy Center and Nexus Line was announced June 30, 2021.”
  • Aliases: Coal Creek Data Center (tracker name); Rainbow Energy Center energy park
    “No project has been announced for the industrial park as of yet, according to county officials, with discussions ongoing.”
  • Stage: announced only
    “No project has been announced for the industrial park as of yet, according to county officials, with discussions ongoing.”
  • Project status: announced only
    “No project has been announced for the industrial park as of yet, according to county officials, with discussions ongoing”
  • Host plant: Coal Creek Station - two lignite-fired steam units, in service 1979 and 1980; North Dakota's largest coal plant
    “The Coal Creek plant, with two units that came online in 1979 and 1980, respectively, has sent electricity to Minnesota for many years.”
  • Site acres: 800 acres
    “The McLean County Commission has approved a request from Rainbow Energy Center to rezone 800 acres of land near Coal Creek Station from agricultural to commercial”