Data center profile · Ward County, Texas

AiOnX Pyote

Data center campus proposed by AiOnX in Ward County, Texas; about 296 MW of IT capacity planned.

Announced. No local approval or permit is on record yet. No utility agreement or generation permit is on record. Newest record Nov. 2021.
The campus, Lower-resolution satellite image, Oct. 18, 2026
370 MW
campus power the company states
facility power, not split into IT capacity
2029+
first building in service, our estimate
no dated power path yet; no company target on record
None named
serving utility
Power plan not yet known
OperatorAiOnX
CustomerNone named
Planned IT capacity296 MW at full build-out (our estimate from the company's 370 MW campus power figure)
First building in serviceOur estimate: 2029 or later (no dated power path yet).
The site

The site from above

Satellite overview
Lower-resolution satellite image, Oct. 18, 2026.
Power

Power and the grid

No utility agreement or generation permit is on record yet.

We checked utility filings, regulator dockets and air-permit records for this campus.

Permits

Permits checklist

5 checked, nothing on file

Approvals a campus like this normally needs, and what we found.

Timeline

What happened, and what is due

SitePaper trailConstructionPowerPermitsMoneyLegalUpcoming
  1. Nov. 1, 2021
    Site Project first appears in the public record
  2. Oct. 2026
    Power SWI Group/AiOnX's $500M acquisition of a 77% holding in GDA covers 15 crypto data centers (1.3 GW of available power) in the US and Sweden. News report · Oct. 2026
Construction activity

Satellite captures by quarter

Since Sept. 2025: 2 satellite captures.

Satellite
’26
Dot size: records in the quarter, largest = 1. Two-digit years mark each first quarter.
Who is involved

Owners, partners and builders

Owners and developers
  • AiOnX, operator
  • SWI Group, owner
Still unknown

Open questions

Where this comes from

16 records from 4 documents

Drawn from news reports, public and commercial datasets and satellite captures, each kept with its date and source. The bar shows documents by type.

News report 2Dataset 1Satellite 1
Evidence

Every quote behind this page

Grade key: A = the primary record itself (permit, filing, exhibit) · B = a dated official statement · C = news reporting. Map distances are our own measurements on OpenStreetMap and carry no grade. Allegations in lawsuits are marked as such in the quotes.

Power (5)
  • Campus name: AiOnX Pyote (GDA Pyote)
    “GDA Pyote is a 370 MW hybrid data center in Pyote, Texas, featuring a 138kV substation”
  • Stated campus size: 370 MW
    “GDA Pyote is a 370 MW hybrid data center in Pyote, Texas, featuring a 138kV substation”
  • Interconnection voltage: 138 kV
    “GDA Pyote is a 370 MW hybrid data center in Pyote, Texas, featuring a 138kV substation”
  • County code: 48475
    “GDA Pyote is a 370 MW hybrid data center in Pyote, Texas”
  • SWI Group/AiOnX's $500M acquisition of a 77% holding in GDA covers 15 crypto data centers (1.3 GW of available power) in the US and Sweden, which AiOnX says will be converted for AI and HPC workloads
    “it now has a 77 percent holding in GDA, which operates 15 crypto data centers in the US and Sweden, with a footprint of 1.3GW of available power”
Money and contracts (1)
  • Project status: operating cryptocurrency mining facility; AiOnX/SWI completed a $500M majority acquisition of GDA in 2026 and announced conversion of the platform to AI/HPC workloads; no IT capacity in service at Pyote and n
    “These data centers will now be converted for AI and HPC workloads”
Legal (1)
  • Announced: Nov. 1, 2021
    “Genesis Digital Assets is building a new self-hosted bitcoin mining data center in West Texas with 300 megawatt of capacity”
Site and other (1)
  • Street address: 4947 Ranch to Market Rd 2355, Pyote, TX 79777
    “AiOnX — 4947 Ranch to Market Rd 2355, 79777 Pyote”

Imagery and records: Satellite imagery: Sentinel-2 (ESA Copernicus).