The site from above
Power and the grid
Getting on the grid
Who supplies what, what it costs, and what is still not public.
- Oct. 15, 2026Utility MW on record201 MW. News report · Oct. 2026
Permits checklist
1 granted · 5 checked, nothing on file
Approvals a campus like this normally needs, and what we found.
- ✓FAA airspace clearance Grantedthe FAA · July 31, 2025: FAA airspace clearance granted by the FAA. FAA · July 2025
- –Checked, nothing on file: Zoning approval, Site plan, Building permit, Water and wetlands permits, Utility and grid approval
What happened, and what is due
- May 27, 2025Permits FAA airspace clearance granted by the FAA. FAA · July 2025
- June 15, 2026Permits Searched through Oct. 20, 2026: ERCOT Monthly Operational Overviews, ERCOT Board Item 14 Batch Zero Update, and web searches. State agency · June 2026
- Sept. 15, 2026Site ERCOT's Batch Zero conditional classifications were published only as aggregates, 204 projects (66.4 GW) conditionally base load. State agency · Sept. 2026
Building activity by quarter
Since May 2025: 2 FAA filings (May 2025 to July 2025): tallest crane 370 ft (May 2025); 3 satellite captures.
Owners, partners and builders
- PowerHouse Data Centers, partner
- Harrison Street, partner
- Brasfield & Gorrie, general contractor
Open questions
- Signed electric service agreement and delivery date.
32 records from 9 documents
Drawn from state agency records, company statements, satellite captures, news reports, public and commercial datasets and local government records, each kept with its date and source. The bar shows documents by type.
Every quote behind this page
Grade key: A = the primary record itself (permit, filing, exhibit) · B = a dated official statement · C = news reporting. Map distances are our own measurements on OpenStreetMap and carry no grade. Allegations in lawsuits are marked as such in the quotes.
Power (13)
- ERCOT's Batch Zero conditional classifications (Board update, September 14-15, 2026) were published only as aggregates - 204 projects (66.4 GW) conditionally base load and 158 projects (127.9 GW) conditionally studied lo“ERCOT has provided conditional classification for all Batch Zero Large Loads”State agency · Sept. 2026 · grade A
- Searched through Oct. 20, 2026: ERCOT Monthly Operational Overviews, ERCOT Board Item 14 Batch Zero Update (Sept. 14, 2026/15), and web searches for 'PowerHouse Irving ERCOT', '111 Customer Way ERCOT' and 'Powerhouse Data LCX P“Planning Studies Approved – Projects that have received ERCOT approval of required interconnection studies”State agency · June 2026 · grade A
- Announced: May 15, 2024“The site, located at 111 Customer Way, will be home to PowerHouse Irving, a nearly one million square foot data center campus that will deliver 200 MW of power when completed.”Company · May 2024 · grade A
- Campus name: PowerHouse Irving (Las Colinas)“The site, located at 111 Customer Way, will be home to PowerHouse Irving”Company · May 2024 · grade B
- Stated campus size: 200 MW“PowerHouse Irving, a nearly one million square foot data center campus that will deliver 200 MW of power when completed”Company · May 2024 · grade B
- Street address: 111 Customer Way, Irving, TX“The site, located at 111 Customer Way, will be home to PowerHouse Irving”Company · May 2024 · grade B
- Utility: Oncor“The site has immediate access to permanent power from an existing adjacent substation, serviced by Oncor”Company · May 2024 · grade B
- Power step: utility named“The site has immediate access to permanent power from an existing adjacent substation, serviced by Oncor”Company · May 2024 · grade B
- First shell delivery stated: late 2025“Construction is scheduled to begin in early 2025, with the first powered shell set to be delivered by late 2025”Company · May 2024 · grade B
- Project status: Under construction: land closed May 2024, construction from early 2025, and the first of three powered-shell buildings was topped out in October 2026 (structure complete; interior systems and infrastructu“With the structure now complete, work continues on interior systems, infrastructure, and the next phases of development across the campus”News report · Oct. 2026 · grade C
- Utility service: 201 MW“the campus will support up to 201MW of utility power across three two-story buildings, totaling approximately 900,000 sq ft”News report · Oct. 2026 · grade C
- First building at PowerHouse Irving topped out (October 2026); structure complete, interior systems and infrastructure work continuing. Construction is by Brasfield & Gorrie for the PowerHouse/Harrison Street JV.“The company announced the topping out of the first building at its Irving campus over the weekend”News report · Oct. 2026 · grade C
- Building count: 3 buildings“The campus includes three powered shell data centers totaling over 946,000 square feet, with a total power load of 67 MW per building”Company · May 2024 · grade C
Money and contracts (3)
- tax abatement agreement: tax abatement 50 %“would be eligible to receive a 50% property tax abatement”Local government · May 2024 · grade A
- land purchase: closed“announced the completed land purchase of 50 acres in Irving-Las Colinas”Company · May 2024 · grade B
- No Oncor substation work, Oncor service agreement, PUCT filing or CCN naming PowerHouse Irving / Powerhouse Data LCX / 111 Customer Way was found in public sources through Oct. 20, 2026. The sole Oncor evidence is the devel“serviced by Oncor, the largest energy delivery company in Texas”Company · May 2024 · grade B
Permits and government (2)
- FAA OE/AAA archive case: Determined - No Hazard“New Construction of Data Centers”FAA · July 2025 · grade A
- FAA OE/AAA archive case: Determined - No Hazard“New Construction of Data Centers”FAA · May 2025 · grade A
Site and other (3)
- ERCOT public listing: not found in ERCOT public large-load reporting (aggregate-only)“No Studies Submitted – Projects that are tracked by ERCOT but that have not yet provided sufficient information”State agency · June 2026 · grade A
- County code: 48113“First announced in 2024, the project is located at 111 Customer Way in Dallas County”News report · Oct. 2026 · grade C
- Site acreage: 50 acres“announced the completed land purchase of 50 acres in Irving-Las Colinas”Company · May 2024 · grade C
Imagery and records: Satellite imagery: Sentinel-2 (ESA Copernicus).