Data center profile · 402 Royal Road, Michigan City, LaPorte County, Indiana

Google Michigan City (Project Maize)

An $800 million data center campus on a former factory site in Michigan City, Indiana, now Google's, with a pending air-permit expansion and no published MW figure

Approved; construction reported, not confirmed. Phase 1 holds a state air permit (Mar. 2026) and the site is reported under construction. A request to roughly double the diesel generator fleet is in public comment, with a hearing on Nov. 17, 2026.
$800M
project value cited by the city's development agency
Sept. 2025 council approvals
198.5 MW
backup diesel generators permitted for Phase 1
70 emergency units; backup only, not power supply (summary by an opposition group)
+67 units
more diesel emergency generators requested
state draft approval in comment; fleet would reach 132
Nov. 17, 2026
virtual public hearing on the permit change
comments close Nov. 23, 2026
OperatorGoogle (confirmed as end user Apr. 16, 2026); permit held by Lavender Fields Holdings LLC
CustomerGoogle (end user)
Planned IT capacity113 MW at full build-out (our estimate from on-site generation)
First building in serviceOur estimate: 2029 or later (no dated power path yet); company says 2026.
Next deadlineNov. 17, 2026: Virtual public hearing on adding 67 diesel emergency generators; comments close Nov. 23, 2026
Power

Power and the grid

Sources on record, size not disclosed
Backup generators (emergency use, not a power supply)

Getting on the grid

Who supplies what, what it costs, and what is still not public.

  1. April 16, 2026
    Google pays for power
    Google says it pays for 100% of the cost of power and infrastructure its operations require. Local government · April 2026
  2. June 2026
    Labor union intervenes at the utility regulator
    IUOE Local 150 files an emergency intervention at the Indiana Utility Regulatory Commission over NIPSCO's service request for the site (press). see Permits
  3. Not set
    Service cause number not public
    No report names the regulatory case for NIPSCO's service request. News report · Oct. 2026
Permits

Permits checklist

1 contested · 1 pending · 2 granted

Approvals a campus like this normally needs (including an air permit for backup generators), and what we found.

Risks

What could slow it down

Money

Money on record

$800M project, per the city's development agency (Sept. 2025). Local government · Sept. 2025

Timeline

What happened, and what is due

SitePaper trailConstructionPowerPermitsMoneyLegalUpcoming
  1. July 25, 2024
    Paper trail Lavender Fields Holdings LLC registered in Delaware
  2. Sept. 2, 2025
    Permits Michigan City's council approves four Project Maize resolutions, including a taxpayer agreement and tax deductions Local government · Sept. 2025
  3. Dec. 9, 2025
    Legal Public meeting on the draft air permit draws opposition to 70 diesel generators News report · Dec. 2025
  4. March 19, 2026
    Permits Indiana issues the Part 70 air permit for Phase 1 State agency · March 2026
  5. April 16, 2026
    Paper trail Google is confirmed publicly as the end user after acquiring the project Local government · April 2026
  6. June 2026
    Legal IUOE Local 150 files an emergency intervention over NIPSCO's service request (press) News report · June 2026
  7. Sept. 18, 2026
    Construction Phoenix Construction and Local 150 reach a labor agreement for Google's campus (press) News report · April 2026
  8. Sept. 25, 2026
    Permits Indiana notices its draft approval to add 67 diesel emergency generators State agency · Sept. 2026
  9. Nov. 17, 2026
    Permits Virtual public hearing on the generator addition; comments close Nov. 23 State agency · Sept. 2026
Construction activity

Building activity by quarter

Since Nov. 2025: 2 FAA filings (Nov. 2025 to July 2026): tallest crane 280 ft (July 2026).

FAA filings
’26
Dot size: records in the quarter, largest = 1. Two-digit years mark each first quarter.
The buildings

Specs

67 to 70 acres
former Federal-Mogul plant site (press)
132 generators
end-state diesel emergency fleet if the pending change is approved
Who is involved

Owners, partners and builders

Owners and developers
  • Google: end user, confirmed Apr. 2026
  • Lavender Fields Holdings LLC: permit holder; an opposition group calls it Google's shell company
  • Phoenix Michigan City Investors LLC: earlier developer and party to the tax resolutions
  • Phoenix Construction: builder
Decision-makers
  • Michigan City Common Council: tax resolutions
  • Indiana Department of Environmental Management: air permits
  • Indiana Utility Regulatory Commission: NIPSCO service request
Still unknown

Open questions

Where this comes from

33 records from 10 documents

Drawn from news reports, state agency records, local government records and business registries, each kept with its date and source. The bar shows documents by type.

News report 4State agency 4Local government 2
Evidence

Every quote behind this page

Grade key: A = the primary record itself (permit, filing, exhibit) · B = a dated official statement · C = news reporting. Map distances are our own measurements on OpenStreetMap and carry no grade. Allegations in lawsuits are marked as such in the quotes.

Power (4)
  • Google stated it is paying for 100 percent of the cost of power for the site and any infrastructure needs driven by its operations, in the April 16, 2026 EDCMC release
    “This includes paying for 100% of the cost of power for the site and any infrastructure needs driven by our operations.”
  • Google acquired the project (site assembled/developed by Phoenix Investors entities after its 2022 purchase of the former Federal Mogul/ANCO plant site, 402 Royal Road, approximately 67-70 acres, USD 832M project as prev
    “Lavender Fields Holdings LLC, Google's shell corporation”
  • On-site generation: 198.5 MW
    “an air permit that will allow Lavender Fields Holdings LLC, Google's shell corporation, to operate a total of 70 diesel emergency generators for phase 1 of the project”
  • JTNWI's summary of the IDEM permit states 70 diesel emergency generators at 198.5 MW capacity for Phase 1; this is a generator-capacity figure on an mw generation onsite basis only - no mw it, mw utility or mw campus sta
    “New Source Construction and Part 70 Operating Permit, 70 diesel emergency generators at 198.5 MW capacity for Phase 1”
Money and contracts (4)
  • Google was publicly confirmed as the end user behind Lavender Fields/Project Maize in April 2026 (queue records the confirmation at April 16, 2026), having acquired the campus from Lavender Fields LLC / Phoenix Investors
    “Phoenix Construction, LLC have reached an agreement to bring union-affiliated workers onto Google's Project Maize data center in Michigan City, Indiana”
  • Sustained organized opposition led by Just Transition Northwest Indiana: canvassing, petitions and protests; at the Dec 9, 2025 IDEM public meeting residents demanded denial of the permit for 70 diesel generators. In Jun
    “We demand that you deny the permit for 70 uncontrolled diesel generators, engines so secret their details are redacted from the public.”
  • Project Maize taxpayer agreement (resolution approved Sept. 2, 2025): taxpayer agreement Common Council approved a resolution approving a taxpayer agreement for Project Maize, the only data center project referred to by nam
    “a resolution approving a taxpayer agreement for 'Project Maize', which was the only data center project referred to by name”
  • Assessed valuation deduction resolutions (Project Maize buildings): tax abatement - assessed valuation deduction Two resolutions granted Phoenix Michigan City Investors LLC an assessed valuation deduction for two separat
    “approved two resolutions granting Phoenix Michigan City Investors LLC an assessed valuation deduction for two separate buildings”
Permits and government (8)
  • Lavender Fields applied (application letter June 15, 2026, via Olsson) for a sig: Significant modification PENDING (091-50515-00195 / 091-50636-00195): +67 generators; comment to Nov. 23, 2026; hearing Nov. 17, 2026
    “Lavender Fields Holdings, LLC has applied to add 67 diesel-fired critical emergency generators and 67 belly tanks, correct descriptions of existing emission units, and remove 2 existing generators”
  • IDEM significant permit modification: application received Jun 29, 2026 to add 67 diesel-fired critical emergency generators and 67 belly tanks, correct existing unit descriptions, and remove 2 existing generators and be
    “Lavender Fields Holdings, LLC has applied to add 67 diesel-fired critical emergency generators and 67 belly tanks, correct descriptions of existing emission units, and remove 2 existing generators and belly tanks.”
  • County code: 18091
    “Preliminary Findings Regarding a Significant Modification to a Part 70 Operating Permit for Lavender Fields Holdings, LLC in LaPorte County”
  • IDEM issued Lavender Fields Holdings LLC (Google's project entity; 402 Royal Roa: Part 70 operating permit T091-49561-00195 ISSUED (Lavender Fields Holdings LLC): 70 diesel emergency generators, phase 1
    “The Indiana Department of Environmental Management (IDEM) has received an application from Lavender Fields Holdings, LLC, located at 402 Royal Road, Michigan City, Indiana 46360”
  • Michigan City Common Council:
    “The Michigan City Common Council approved four resolutions related to Project Maize, moving the $800 million data center project into the next phase.”
  • FAA obstruction evaluation (7460-1): Evaluating
    “ASN 2026-AGL-6860-OE: Crane, Crane, 280 ft AGL, 908 ft AMSL, 41.71520,-86.84462, Evaluating, submitted 2026-07-13”
    FAA · July 2026 · grade B
  • FAA obstruction evaluation (7460-1): Determined - No Hazard
    “ASN 2025-AGL-14422-OE: Crane, Crane, 160 ft AGL, 788 ft AMSL, 41.71472,-86.84249, Determined - No Hazard, submitted 2025-11-26”
    FAA · Nov. 2025 · grade B
  • In June 2026 IUOE Local 150: IUOE Local 150 emergency intervention (June 2026) in NIPSCO's power-service request for Project Maize
    “In June, Local 150 filed an emergency intervention with the Indiana Utility Regulatory Commission over NIPSCO's power-service request for the site”
Site and other (2)
  • Project status: under construction
    “These violations have raised substantial concerns among nearby residents, who are already enduring 24/7 noise and light pollution from the facility's construction.”
  • Google's end-user / operator role for Project Maize was confirmed publicly on April 16, 2026; EDCMC published its Google acquisition release the same day and Chicago Tribune / ABC57 reporting is dated April 16, 2026
    “End-User: Google (confirmed publicly on April 16, 2026)”