Intel Santa Clara HPC data center (fuel-cell expansion)

Intel's in-house high-performance computing data center in Santa Clara, California, on Bloom fuel cells since 2014, adding capacity under a 2024 deal.

Operating, expansion unconfirmed. Intel's Santa Clara HPC data center runs today with Bloom fuel cells on site since 2014, and a May 2024 deal adds more fuel-cell capacity for its next expansion. No MW figure, completion date or air permit for the expansion has been published.
1.06 PUE
power usage effectiveness of the existing data center
Intel figure
400,000+
Intel Xeon servers in its HPC data centers
plus 700+ petabytes of storage (Bloom release)
Since 2014
Bloom fuel cells on site
the 2024 deal expands this installation
Not disclosed
fuel-cell MW added in 2024
the release says only 'additional megawatts'
OperatorIntel (owner and operator)
CustomerIntel's own chip design and foundry teams; no outside tenant
First building in serviceIn service since 2015
Next stepNone published; no completion date for the expansion
Power

Power and the grid

Energized, size not disclosed · contracted, size not disclosed

Sources on record, size not disclosed

Getting on the grid

Permits

Permits checklist

1 checked, nothing on file

Approvals on record for the fuel-cell expansion, and what we could not find.

Risks

What could slow it down

Timeline

What happened, and what is due

SitePaper trailConstructionPowerPermitsMoneyLegalUpcoming
  1. 2014
    Power Bloom fuel cells installed at Intel's Santa Clara data center Company · May 2024
  2. 2023
    Power The city utility stops accepting new data-center service requests (city) Local government · Oct. 2026
  3. May 9, 2024
    Power Bloom and Intel announce a deal to add fuel-cell capacity for the next data-center expansion Company · May 2024
Construction activity

Building activity by quarter

Since May 2022: 2 FAA filings (May 2022 to Dec. 2023): tallest crane 410 ft (May 2022).

FAA filings
’23
Dot size: records in the quarter, largest = 1. Two-digit years mark each first quarter.
The buildings

Specs

700+ PB storage, with 800,000+ network ports, across Intel's HPC data centers (Bloom release). Company · May 2024

Who is involved

Owners, partners and builders

Owner
  • Intel: owner and operator; the computing serves Intel Products and Intel Foundry
Power
  • Bloom Energy: fuel-cell supplier since 2014
  • Silicon Valley Power: city-owned utility
Still unknown

Open questions

Where this comes from

25 records from 7 documents

Drawn from company statements, local government records, state agency records and news reports, each kept with its date and source. The bar shows documents by type.

Company 2Local government 2State agency 2News report 1
Evidence

Every quote behind this page

Grade key: A = the primary record itself (permit, filing, exhibit) · B = a dated official statement · C = news reporting. Map distances are our own measurements on OpenStreetMap and carry no grade. Allegations in lawsuits are marked as such in the quotes.

Power (10)
  • Size status: no MW on any basis - the May 9, 2024 Bloom-Intel power capacity agreement states no number ('additional megawatts' only) for the added fuel cells or the campus; no fuel-cell nameplate MW (generation basis),
    “The agreement calls for the installation of additional megawatts (MW) of Bloom Energy's fuel cell-based Energy Server”
  • City of Santa Clara BW2 + CUB2 Project Impacts Analysis Report (Draft, Architectural Resources Group, Sept 2025), 3065 Bowers Ave (APN 216-46-015): describes SOFC platforms for a mask-operations/manufacturing expansion w
    “This yard would contain solid oxide fuel cell (SOFC) platforms that convert natural gas into electricity without combustion.”
  • Project identity: Intel Corporation high-performance computing data center, Santa Clara, CA - existing facility with a Bloom Energy fuel cell installation on site since 2014; a May 2024 Bloom-Intel power capacity agreeme
    “The agreement calls for the installation of additional megawatts (MW) of Bloom Energy's fuel cell-based Energy Server at Intel's existing high-performance computing data center in Santa Clara, CA.”
  • County code: 06085
    “The agreement calls for the installation of additional megawatts (MW) of Bloom Energy's fuel cell-based Energy Server at Intel's existing high-performance computing data center in Santa Clara, CA.”
  • Project status: operating with fuel cell expansion agreed
    “To meet additional HPC scale needed for Intel Products and Intel Foundry, Intel is leveraging Bloom Energy technology to power the next Data Center expansion.”
  • Bloom positions the expanded installation as the single largest fuel cell-powered high-performance computing data center in Silicon Valley
    “The resulting installation will be the single largest fuel cell-powered high-performance computing data center in Silicon Valley.”
  • Intel states the existing hyperscale Santa Clara data center operates at 1.06 PUE, powering 400,000+ Xeon servers for Intel chip design
    “existing hyperscale Intel Santa Clara Data Center operating at 1.06 PUE, enabling the HPC scale needed for complex Intel chip design and technology development”
  • Bloom fuel cells at this campus are on-site generation that can run grid-parallel with utility power or as a fully islanded microgrid; the release does not state which mode the added capacity uses
    “Bloom's offerings can be deployed as Grid Parallel in conjunction with utility power to meet dual source energy needs of a Data Center or as Grid Independent”
  • No source fetched states a numeric size, a completion date or a completion confirmation for the 2024 fuel-cell expansion; installation status remains unconfirmed in this pass
    “The agreement calls for the installation of additional megawatts (MW) of Bloom Energy's fuel cell-based Energy Server at Intel's existing high-performance computing data center in Santa Clara, CA.”
  • Bloom fuel cells at Intel Santa Clara operate grid-parallel with utility power and can island as a microgrid; the installation is the largest fuel cell powered HPC data center in Silicon Valley per Bloom.
    “Bloom's offerings can be deployed as Grid Parallel in conjunction with utility power to meet dual source energy needs of a Data Center”
Money and contracts (2)
  • power capacity agreement: capacity
    “announced today a power capacity agreement with Intel Corporation that will result in Silicon Valley's largest fuel cell-powered high-performance computing data center.”
  • power capacity agreement: on-site generation capacity
    “The agreement calls for the installation of additional megawatts (MW) of Bloom Energy's fuel cell-based Energy Server at Intel's existing high-performance computing data center in Santa Clara, CA”
Permits and government (2)
  • FAA OE/AAA archive case, Crane "Mission College Intel SC12", 195 ft AGL / 222 f: Determined - No Hazard
    “ASN 2023-AWP-20487-OE: Mission College Intel SC12, crane, 195 ft AGL, 222 ft AMSL, 37.38590,-121.96658, Determined - No Hazard, submitted 2023-12-07”
    FAA · Dec. 2023 · grade A
  • FAA OE/AAA archive case, Crane "Intel Mission College 2", 410 ft AGL / 436 ft A: Determined - No Hazard
    “ASN 2022-AWP-9862-OE: Intel Mission College 2, crane, 410 ft AGL, 436 ft AMSL, 37.38692,-121.96257, Determined - No Hazard, submitted 2022-05-13”
    FAA · May 2022 · grade A
Site and other (1)
  • Intel describes the Santa Clara HPC data center as operating at 1.06 PUE (context for the fuel cell expansion's load profile; no capacity figure disclosed).
    “Intel is leading the industry in extreme energy-efficient high-performance computing data centers with existing hyperscale Intel Santa Clara Data Center operating at 1.06 PUE”