The site from above
Power and the grid
The plan on record is the grid, with on-site gas as a bridge. No utility agreement or generation permit is on record yet.
We checked utility filings, regulator dockets and air-permit records for this campus.
Permits checklist
6 checked, nothing on file
Approvals a campus like this normally needs (including an air permit for backup or on-site generators), and what we found.
- –Checked, nothing on file: Zoning approval, Site plan, Building permit, Air permit, Water and wetlands permits, Utility and grid approval
What happened, and what is due
- Nov. 13, 2025Site Project first appears in the public record
- Sept. 1, 2026Site PA DEP issued violations to Keel Infrastructure for failure to remove a coal ash pile at the Scrubgrass plant. News report · Sept. 2026
Satellite captures by quarter
Since Sept. 2025: 2 satellite captures.
Owners, partners and builders
- Keel Infrastructure, developer
Open questions
- Signed electric service agreement and delivery date.
- Whether site work has started.
17 records from 8 documents
Drawn from news reports, public and commercial datasets, satellite captures and company statements, each kept with its date and source. The bar shows documents by type.
Every quote behind this page
Grade key: A = the primary record itself (permit, filing, exhibit) · B = a dated official statement · C = news reporting. Map distances are our own measurements on OpenStreetMap and carry no grade. Allegations in lawsuits are marked as such in the quotes.
Power (3)
- Project status: proposed“Keel has submitted load studies totaling 750 megawatts and has started pre-engineering studies with a natural gas transporter”News report · June 2026 · grade C
- Stated campus size: 1,300 MW“the company is targeting a 750MW grid connection alongside 550MW of natural gas capacity, for a total of around 1.3GW”News report · June 2026 · grade C
- On-site generation: 550 MW“alongside 550MW of natural gas capacity, for a total of around 1.3GW”News report · June 2026 · grade C
Money and contracts (1)
- acquisition: closed“Keel took over the site, along with the Scrubgrass plant in western PA, after acquiring Stronghold Digital Mining in 2025”News report · June 2026 · grade C
Permits and government (1)
- PA DEP issued violations to Keel Infrastructure for failure to remove a coal ash pile at the Scrubgrass plant.“DEP Issues Violations To KEEL Infrastructure For Failing To Remove Coal Ash Pile At Scrubgrass Coal Waste-Fired Data Center Power Plant In Venango County”News report · Sept. 2026 · grade C
Legal (1)
- Announced: Nov. 13, 2025“A potential gigacampus”Company · Nov. 2025 · grade A
Site and other (5)
- County code: 42121Measured on OpenStreetMap map data.
- Keel held three town halls on Sept. 22, 2026 (Slippery Rock, Franklin and Grove City) on the Scrubgrass expansion.“Town halls 22 September 2026; reported 23 September 2026”Dataset · Sept. 2026 · grade C
- Site acreage: 650 acres“Keel's Q2 presentation shows the 650-acre Scrubgrass site in Pennsylvania's Venango County”News report · Aug. 2026 · grade C
- Campus name: Keel Scrubgrass (Scrubgrass Generating Station site)“Keel Infrastructure leadership briefed approximately 100 residents on plans to convert the Scrubgrass Generating Station property in Venango County”News report · June 2026 · grade C
- The site hosts the legacy Scrubgrass waste-coal generating plant, at which Stronghold ran bitcoin mining from 2021; That legacy plant and mining load are not the proposed AI campus and are not counted as the campus being“Built in 1992, Keel took over the site, along with the Scrubgrass plant in western PA, after acquiring Stronghold Digital Mining in 2025”News report · June 2026 · grade C
Imagery and records: Satellite imagery: Sentinel-2 (ESA Copernicus).