Power and the grid
- Grid supply, provider not yet chosen Not negotiatedthe developer must negotiate its own supply under Georgia's customer-choice rules; an on-site substation is planned News report · March 2025
Getting on the grid
- An existing electrical transmission line crosses the site. News report · March 2025
- Equinix's 240 MW Hampton campus and the 603-acre Hampton Technology Park are separate projects. News report · Feb. 2026
Permits checklist
1 granted · 2 checked, nothing on file
Approvals on record for the campus, and what we could not find.
- ✓Conditional use permit GrantedHampton City Council · March 25, 2025: 5-0 on final reading, with farm, park, buffer and occupancy conditions News report · March 2025
- –Checked, nothing on file: Development of Regional Impact review, Power supply filing
What could slow it down
- MediumMoratorium talkHampton has considered a 120-day moratorium on data-center development since early 2026 (press). News report · Feb. 2026
- MediumPower not arrangedThe developer must negotiate its own power supply, and no supplier or MW figure has been published. News report · March 2025
- WatchOpening tied to housingThe campus cannot get an occupancy permit until at least 100 Henderson Farms homes have theirs. News report · March 2025
Money on record
$75,000 developer contribution for city architectural style guides (permit condition). News report · March 2025
What happened, and what is due
- 2008Site The 900-acre Henderson Farms mixed-use development is rezoned, then stalls in the recession News report · March 2025
- March 25, 2025Permits Hampton council gives final approval to the data-center permit, 5-0 News report · March 2025
- Feb. 16, 2026Permits Hampton weighs a 120-day moratorium on data-center development (press) News report · Feb. 2026
Specs
- Hydroponic farm: on site, with produce donated to nonprofits (permit condition) News report · March 2025
Owners, partners and builders
- Southeast Property Holdings LLC: applicant and developer
- Hampton City Council: approved the permit
- University of Georgia: in talks on the hydroponic farm (press)
Open questions
- Who the end user is.
- Power supplier and MW.
- Whether construction has started.
45 records from 5 documents
Drawn from news reports, each kept with its date and source. The bar shows documents by type.
Every quote behind this page
Grade key: A = the primary record itself (permit, filing, exhibit) · B = a dated official statement · C = news reporting. Map distances are our own measurements on OpenStreetMap and carry no grade. Allegations in lawsuits are marked as such in the quotes.
Power (9)
- Equinix is developing a separate four-building, 240 MW campus in Hampton (1100 Site Pkwy). Its 240 MW and its filings belong to Equinix's record, not to Southeast Property Holdings' Henderson Farms campus.“Equinix is developing a 240MW, four-building campus in the area.”News report · Oct. 2026 · grade C
- Do not import its facts (including its 1,500 MW DRI figure) into t“Hampton Technology Park Owner, LLC has filed a Developments of Regional Impact (DRI) application with the Georgia Department of Community Affairs for a new campus in the city of Hampton.”News report · Oct. 2026 · grade C
- Equinix's 240 MW four-building campus in the Hampton area is a separate project; its 240 MW must not be attributed to this campus“Equinix is developing a 240MW, four-building campus in the area.”News report · Oct. 2026 · grade C
- Equinix's 240 MW four-building Hampton-area campus and Hampton Technology Park Owner LLC's 603-acre, 4 million sq ft DRI campus are separate projects from Southeast Property Holdings' 133-acre Henderson Farms site; their“The 603-acre Hampton Technology Park could total five buildings and 4 million sq ft (371,610 sqm).”News report · Feb. 2026 · grade C
- Project status: Conditional use permit APPROVED (second and final reading 5-0 on March 25, 2025); planned: three buildings of 195,000 sq ft each plus an electrical substation; zoning conditions include a hydroponic farm,“The data center campus is planned to consist of three buildings, each measuring 195,000 square feet, and an electrical substation.”News report · March 2025 · grade C
- There is no power supplier, agreement or MW for this campus yet: the city staff report states the developer is responsible for negotiating the site's power supply (Georgia lets large projects choose their provider) and d“The developer will be responsible for negotiating the power supply for the site.”News report · March 2025 · grade C
- The developer is responsible for negotiating its own power supply; the staff report discloses no planned energy use in megawatts“The exact megawatts of planned energy use were not mentioned in the staff report.”News report · March 2025 · grade C
- Planned scope: three buildings of 195,000 sq ft each plus an electrical substation“The data center campus is planned to consist of three buildings, each measuring 195,000 square feet, and an electrical substation.”News report · March 2025 · grade C
- The developer must negotiate the site's power supply itself under Georgia's customer-choice rules for large loads; the city staff report does not state the planned megawatts, and no utility filing stating a figure was fo“The exact megawatts of planned energy use were not mentioned in the staff report.”News report · March 2025 · grade C
Money and contracts (5)
- zoning condition: development obligation (financial contribution) 75000 $“contribute $75,000 to Hampton so the city can prepare architectural style guides for non-residential buildings”News report · March 2025 · grade C
- zoning condition: development obligation (community benefit)“establish and maintain a hydroponic farm on the property, and donate grown produce from the site to non-profit organizations”News report · March 2025 · grade C
- zoning condition: development obligation (financial contribution) 75000 USD“contribute $75,000 to Hampton so the city can prepare architectural style guides for non-residential buildings in the city's village mixed-use developments”News report · March 2025 · grade C
- zoning condition: development obligation (community benefit)“establish and maintain a hydroponic farm on the property, and donate grown produce from the site to non-profit organizations”News report · March 2025 · grade C
- zoning condition: development obligation (occupancy trigger)“no certificate of occupancy (CO) will be issued until at least 100 residential units within the Henderson Farms project have an issued CO”News report · March 2025 · grade C
Permits and government (10)
- By February 2026 Hampton was considering a 120-day moratorium on data center development while it assesses impacts, in the context of the separate 603-acre Hampton Technology Park DRI; the moratorium debate post-dates th“Hampton is a city in southwestern Henry County, some 35 miles south of Atlanta. It is currently considering a 120-day moratorium on data center development”News report · Feb. 2026 · grade C
- Project identity: Southeast Property Holdings LLC data center campus: 133 acres north of Georgia 20 at McDonough Street, Hampton GA, inside the 900-acre Henderson Farms mixed-use development (proposed and rezoned in 2008“Southeast Property Holdings, LLC applied for a conditional use permit to permit a data center campus on 133 acres in Hampton.”News report · March 2025 · grade C
- Project identity: Southeast Property Holdings LLC data center campus, 133 acres north of Georgia 20 at McDonough Street, Hampton GA, inside the 900-acre Henderson Farms mixed-use development“Southeast Property Holdings, LLC applied for a conditional use permit to permit a data center campus on 133 acres in Hampton.”News report · March 2025 · grade C
- conditional use permit: approved on second and final reading, 5-0 vote“The council passed the second and final reading by a 5-0 vote (Councilman Turner) absent on Tuesday, March 25, 2025.”News report · March 2025 · grade C
- Hampton City Council:“The council passed the second and final reading by a 5-0 vote (Councilman Turner) absent on Tuesday, March 25, 2025.”News report · March 2025 · grade C
- County code: 13151“Hampton officials have approved a conditional use permit for what will become the first data center in Henry County.”News report · March 2025 · grade C
- Project status: approved conditional use permit“The council passed the second and final reading by a 5-0 vote (Councilman Turner) absent on Tuesday, March 25, 2025.”News report · March 2025 · grade C
- conditional use permit: approved on second and final reading, 5-0 vote“The council passed the second and final reading by a 5-0 vote (Councilman Turner) absent on Tuesday, March 25, 2025.”News report · March 2025 · grade C
- CUP conditions include a hydroponic farm with produce donated to non-profits, green roofs on at least 25% of roof space for buildings over 100,000 sq ft, a Towaliga River park set-aside, a $75,000 contribution toward cit“no certificate of occupancy (CO) will be issued until at least 100 residential units within the Henderson Farms project have an issued CO”News report · March 2025 · grade C
- Announced: Jan. 2025“Southeast Property Holdings LLC first applied for conditional use permit in January this year”News report · Jan. 2025 · grade C
Site and other (5)
- A Change.org opponents' petition lists 'Old Henderson Farms - Hwy 20 & McDonough St. - 2 and/or 3 buildings' among three Hampton sites it claims are under construction; the claim is advocacy-sourced and was not independe“Old Henderson Farms - Hwy 20 & McDonough St. - 2 and/or 3 buildings”News report · Oct. 2026 · grade C
- Two other Hampton projects are separate records: Hampton Technology Park (603 acres, Hampton Technology Park Owner LLC, DRI filed, build-out to 2033) and 0 Rocky Creek (1.25M sq ft DRI by Swearingen Consulting / Red Wolf“The 603-acre Hampton Technology Park could total five buildings and 4 million sq ft (371,610 sqm).”News report · Oct. 2026 · grade C
- Citizens' petition updated Aug 2026 lists 'Old Henderson Farms - Hwy 20 & McDonough St. - 2 and/or 3 buildings' among three sites under construction in the city limits of Hampton; no official construction confirmation in“1. Old Henderson Farms - Hwy 20 & McDonough St. - 2 and/or 3 buildings”News report · Aug. 2026 · grade C
- Site location: 133 acres north of Georgia 20 at McDonough Street, Hampton GA, inside Henderson Farms“The 133-acre property is located north of Georgia 20 at McDonough Street. It is part of the larger Henderson Farms project.”News report · March 2025 · grade C
- Parent development: Henderson Farms, 900-acre mixed-use development“Henderson Farms is a 900-acre mixed-use development proposed and rezoned in 2008, but never built due to the Great Recession.”News report · March 2025 · grade C