Data center profile · Northeast of Pampa, Gray County, Texas

Meitner Energy Center (Intersect Power, Pampa)

Intersect Power's Meitner Energy Center site northeast of Pampa, Texas: air and stormwater permits issued, press reports $3 billion data-center target, no data-center building confirmed.

Energy permits issued. Texas issued air permits for the Meitner Energy Center on May 28, 2026, and construction stormwater coverage followed between July and September 2026. Data-center construction is not confirmed, and the data-center wastewater authorization is still an application.
$3B
data-center development Intersect Power is targeting here (press)
press account; no company filing states a figure
May 2026
state air permits issued for the energy center
Texas environmental agency permit 184049, issued Ip Meitner Gas LLC
data-center buildings confirmed under construction
only energy-center site works and permits are on record
OperatorIntersect Power (named by press; air permit held by Ip Meitner Gas LLC)
CustomerNone named
First building in serviceOur estimate: 2029 or later (no dated power path yet).
Next stepNone published: the data-center wastewater authorization is still an application
Power

Power and the grid

Sources on record, size not disclosed

What is next door

campus5.37 km · gas pipeline8.68 km · 69 kV substation10.50 km · 345 kV linecampus5.37 km · gas pipeline8.68 km · 69 kV substation10.50 km · 345 kV line

Measured from the state permit record point, not a surveyed site boundary. Distances from mapped lines and plants. OpenStreetMap · Oct. 2026

Permits

Permits checklist

1 pending · 2 granted

Approvals a campus like this normally needs, and what we found.

Risks

What could slow it down

Timeline

What happened, and what is due

SitePaper trailConstructionPowerPermitsMoneyLegalUpcoming
  1. May 28, 2026
    Permits Texas issues air permits for the Meitner Energy Center to Ip Meitner Gas LLC State agency · Oct. 2026
  2. Sept. 2026
    Construction Construction stormwater coverage is issued over July to September for wind, solar and paving work at the site State agency · Sept. 2026
  3. Oct. 2026
    Money Press reports Intersect Power is targeting a $3 billion data-center development in the Pampa area News report · Oct. 2026
Construction activity

Building activity by quarter

Since Feb. 2026: 3 FAA filings (Feb. 2026 to May 2026): tallest permanent building 55 ft (filed Feb. 2026) and tallest crane 600 ft (May 2026).

FAA filings
’26
Dot size: records in the quarter, largest = 2. Two-digit years mark each first quarter.
Who is involved

Owners, partners and builders

Developer
  • Intersect Power: developer named by press
  • Ip Meitner Gas LLC: holder of the air permit
Builders on site
  • M. A. Mortenson Company: general contractor (employer on site)
Still unknown

Open questions

Where this comes from

29 records from 8 documents

Drawn from state agency records, public and commercial datasets and news reports, each kept with its date and source. The bar shows documents by type.

State agency 3Dataset 3News report 2
Evidence

Every quote behind this page

Grade key: A = the primary record itself (permit, filing, exhibit) · B = a dated official statement · C = news reporting. Map distances are our own measurements on OpenStreetMap and carry no grade. Allegations in lawsuits are marked as such in the quotes.

Power (9)
  • Registry status: air permits issued construction underway
    “MEITNER ENERGY CENTER; 184049; Air New Source; ISSUED PERMIT; Ip Meitner Gas, LLC; begin 2026-05-28”
  • Construction stage: energy-center permits issued; site works under way - TCEQ air NSR permits for the Meitner Energy Center (RN112441241) issued May 28, 2026 and construction stormwater coverage issued Jul-Sep 2026 (Meitne
    “MEITNER ENERGY CENTER | 184049 | Air New Source | ISSUED PERMIT | Ip Meitner Gas, LLC; MEITNER PKN ASPHALT PAVING | TXR1505ZJ | Stormwater | ISSUED PERMIT | Duininck, Inc.”
  • Campus name: Meitner Energy Center
    “MEITNER ENERGY CENTER | 184049 | Air New Source | Intersection of County Road B and County Road 21 northeast of Pampa | ISSUED PERMIT | Ip Meitner Gas, LLC”
  • Nearest substation: 8.68 km - unnamed substation (69 kV)
    Measured on OpenStreetMap map data.
  • Nearest power line of 345 kV or more: 10.50 km - 345 kV line
    Measured on OpenStreetMap map data.
  • Nearest power line of 138 kV: none - no lines in the 100-345 kV band mapped on the map within 15 km
    Measured on OpenStreetMap map data.
  • Nearest gas pipeline: 5.37 km - unnamed pipeline
    Measured on OpenStreetMap map data.
  • Nearest power plant: 8.93 km - wind turbine
    Measured on OpenStreetMap map data.
  • Developer: Intersect Power
    “Intersect Power is known to be targeting a $3 billion data center development in the Pampa area of Gray County, south of Miami, known as the Meitner Project”
Money and contracts (1)
  • Announced: Jan. 17, 2026
    “Construction is now underway on a $3 billion data center project called Meitner in Pampa.”
Permits and government (7)
  • air nsr: issued
    “ENGINES AND TURBINES”
  • air nsr: issued
    “ELECTRIC GENERATING FACILITIES”
  • FAA obstruction evaluation (7460-1): Determined - No Hazard
    “ASN 2026-ASW-6365-OE: PKN Data Center, Mobile Crane, 600 ft AGL, 3710 ft AMSL, 35.58595,-100.71912, Determined - No Hazard, submitted 2026-05-13”
    FAA · May 2026 · grade B
  • FAA obstruction evaluation (7460-1): Determined - No Hazard
    “ASN 2026-ASW-2391-OE: Crawler Crane, Mobile Crane, 325 ft AGL, 3435 ft AMSL, 35.58595,-100.71912, Determined - No Hazard, submitted 2026-02-11”
    FAA · Feb. 2026 · grade B
  • Tallest structure filed with the FAA (ft): 55 ft
    “ASN 2026-ASW-1940-OE: PKN Data Center, Building, 55 ft AGL, 3165 ft AMSL, 35.58595,-100.71912, Determined - No Hazard, submitted 2026-02-03”
    FAA · Feb. 2026 · grade B
  • FAA obstruction evaluation (7460-1): Determined - No Hazard
    “ASN 2026-ASW-1940-OE: PKN Data Center, Building, 55 ft AGL, 3165 ft AMSL, 35.58595,-100.71912, Determined - No Hazard, submitted 2026-02-03”
    FAA · Feb. 2026 · grade B
  • FAA OE/AAA records the first filings naming this site's data-center component: a 55-ft building and a 600-ft mobile crane filed as 'PKN Data Center' (ASNs 2026-ASW-1940-OE, submitted Feb. 3, 2026, and 2026-ASW-6365-OE, sub
    “ASN 2026-ASW-1940-OE: PKN Data Center, Building, 55 ft AGL, 3165 ft AMSL, 35.58595,-100.71912, Determined - No Hazard, submitted 2026-02-03”
    FAA · Feb. 2026 · grade B