Data center profile · South Fulton / College Park, Fulton County, Georgia

Stonewall Tell corridor (EdgeConneX/TA Realty; Microsoft; RSC)

Data center campus developed by EdgeConneX, TA Realty, Microsoft and RSC in Fulton County, Georgia, on grid power; about 216 MW of IT capacity planned.

Under construction. Zoning approval, air permit and development of Regional Impact review granted. A utility is named, but no signed service agreement is on record. Newest record Oct. 2026.
The campus, Lower-resolution satellite image, Oct. 15, 2026
270 MW
utility load on file
facility power, not split into IT capacity
63
acres in the site
3
data center buildings planned
OperatorEdgeConneX, TA Realty, Microsoft and RSC
CustomerNone named
Planned IT capacity216 MW at full build-out (our estimate from the company or utility power figure)
First building in serviceOur estimate: 2029 or later (no dated power path yet); company says 2026.
The site

The site from above

Satellite overview
Lower-resolution satellite image, Oct. 15, 2026.
Power

Power and the grid

Getting on the grid

Who supplies what, what it costs, and what is still not public.

  1. Oct. 30, 2025
    Utility MW on record

On-site generation on file

Backup generators (emergency use, not a power supply)
Permits

Permits checklist

3 granted · 4 checked, nothing on file

Approvals a campus like this normally needs (including an air permit for backup generators), and what we found.

Money

Money on record

$318M
Land purchase
Campus land sale, ~63 acres News report · July 2024
$75M
Economic development incentives
Incentive package over 10 years News report · July 2024
Timeline

What happened, and what is due

SitePaper trailConstructionPowerPermitsMoneyLegalUpcoming
  1. Sept. 26, 2024
    Permits Air permit issued by Georgia EPD. State agency · Oct. 2025
  2. March 30, 2025
    Permits Development of Regional Impact review issued by Atlanta Regional Commission. State agency · March 2025
  3. July 16, 2025
    Permits Rezoning approved by City of South Fulton Planning Commission. News report · July 2025
Construction activity

Satellite captures by quarter

Since Sept. 2025: 4 satellite captures.

Satellite
’26
Dot size: records in the quarter, largest = 1. Two-digit years mark each first quarter.
Who is involved

Owners, partners and builders

Owners and developers
  • EdgeConneX, developer
  • TA Realty, landowner
  • Microsoft, owner
Still unknown

Open questions

Where this comes from

35 records from 9 documents

Drawn from news reports, state agency records, satellite captures and company statements, each kept with its date and source. The bar shows documents by type.

News report 5State agency 2Satellite 1Company 1
Evidence

Every quote behind this page

Grade key: A = the primary record itself (permit, filing, exhibit) · B = a dated official statement · C = news reporting. Map distances are our own measurements on OpenStreetMap and carry no grade. Allegations in lawsuits are marked as such in the quotes.

Power (11)
  • Utility service: 270 MW
    “The data center will require a maximum demand of 270 MW for all three buildings”
  • Role of the on-site plant: backup
    “These emergency generators are needed to operate the facility at full functionality during outages in commercial power”
  • On-site power technology: 126 identical 3,000 kW diesel-powered Caterpillar 3516E engine-generator sets with SCR (EG001-EG126), max 90 running in an outage with 36 for redundancy/misfires, plus two 1,750 kW back-of-house
    “with a total of 126 identical 3,000 kW dieselpowered Caterpillar (CAT) 3516E engines and generators sets (Source Codes: EG001 through EG126) to provide emergency backup power when needed”
  • Generator maker and model: Caterpillar 3516E
    “126 identical 3,000 kW dieselpowered Caterpillar (CAT) 3516E engines and generators sets”
  • Announced: July 16, 2024
    “announce today the joint development of a 324MW hyperscale data center campus in Atlanta, GA”
  • Project description: 1,902,000 sq ft data center in three buildings plus an on-site electrical substation on 59 acres, Stonewall Tell Road south of South Fulton Parkway, City of South Fulton, GA (ARC DRI 4342)
    “construct a data center with a total of 1,902,000 SF of space in three buildings along with an electrical substation and supporting facilities”
  • Power status: no utility named, no MW stated and no service agreement in any public source through Oct 20, 2026; only a proposed on-site substation in the DRI site plan
    “along with an electrical substation and supporting facilities”
  • TA Realty separately filed for its Red Oak ATL03 campus at 7170 Red Oak Road, Union City (outside the Stonewall Tell corridor); corridor context only, not part of this campus.
    “TA Realty has filed an application with the Georgia Department of Community Affairs to build a data center campus at 7170 Red Oak Road in Union City, Fulton County”
  • Stated campus size: 324 MW
    “The project is reportedly set to total 324MW across 2.1 million sq ft (195,096 sqm)”
  • The Stonewall Tell queue row is a corridor, not one campus; (2) Microsoft ATL50 at 5235 Stonewall Tell Road, two three-story buildings totalling 910,000 sq ft on an 88-acre parcel, DRI filed September 2026, site set to l
    “Each building will span three stories, with the site set to launch in 2032”
  • Project status: Under construction, well advanced. Three buildings (ATL11, ATL12, ATL13) are permitted under a Georgia EPD air permit issued Sept. 26, 2024 naming Burr Computer Environments as operator; Sentinel-2 shows two
    “Construction is set to commence later this year, with the first phase of the data center campus expected to be operational by 2026”
Money and contracts (3)
  • land purchase: Campus land sale, ~63 acres, Stonewall Tell Road north of South Fulton Parkway 318500000 USD
    “The site, along Stonewall Tell Road just north of South Fulton Parkway, sold for $318.5 million - equating to around $5 million per acre”
  • economic development incentives: Incentive package over 10 years 75000000 USD
    “Last month, the Development Authority of Fulton County approved $75 million in incentives over a 10-year period for EdgeConneX”
  • ConnectCRE reports the EdgeConneX campus will cost roughly $1.8 billion across three phases, completion by 2029, with the first phase a 612,000 sq ft building.
    “The development will eventually measure about 2.1 million square feet and cost roughly $1.8 billion”
Permits and government (5)
  • air permit (backup): issued
    “Burr Computer Environments, Inc. operates Edgeconnex ATL11, LLC (formerly ATL11) under Air Permit No. 7374-121-0977-S-01-0, issued on September 26, 2024”
  • air permit (backup): applied
    “The facility submitted App. 29750, dated June 13, 2025, for the installation and operation of two 1,750 kW backofhouse (BOH) dieselfired emergency generators”
  • Development of Regional Impact review: final report issued (review completed)
    “Name of Proposal: Stonewall Tell Data Center DRI 4342”
  • Developer: RSC Investment Management (Stan Conway); TA Digital also represented at the Jul 2025 rezoning hearing
    “an attorney representing RSC Investment Management and TA Digital”
  • rezoning (city-initiated) and related permits: recommended approval with conditions
    “recommended approval for a city-initiated rezoning and related permits to allow a data center near Stonewall Tell Road”
Site and other (5)
  • Campus name: EdgeConneX ATL11 / ATL12 / ATL13 (Stonewall Tell, Union City)
    “The facility is a collection of data centers located on Stonewall Tell Road in Union City, Fulton County”
  • Building count: 3
    “The facility consists of three main buildings (ATL11, ATL12, and ATL13)”
  • County code: 13121
    “Location: Union City, GA (Fulton County)”
  • Street address: 4810 Stonewall Tell Road, Union City, GA
    “The company is also said to be developing in Union City on the north side of South Fulton Parkway at 4810 Stonewall Tell Road in partnership with EdgeConneX”
  • Site acreage: 63 acres
    “Property records from BizJournal show an affiliate of Virginia-based EdgeConneX acquired nearly 63 acres in Union City in early July”

Imagery and records: Satellite imagery: Sentinel-2 (ESA Copernicus).